I have more than 12years of experience in Railway signaling and in Engineering and Maintenance. I'm presently associated with Siemens Qatar (education city tram) Signaling & communication department. I also worked 1 year with Thales and Alstom for route expo 2020 project for installation, testing & commissioning of loop cable, switch machine, electronics rack, relay rack as a project supervisor from Serco side. I am confident that I have the required skills and Knowledge, which help me perform the job efficiently and effectively.
6 yrs 5 mos
Full-time
Jun 2018 - Present
• Supports the Installation team during T&C phase of Passenger Information Systems (PIS), Public Address System (PAS) and Intrusion alarm system (IAS). • Installing, Maintaining Sicas S7 Interlocking system. • Installing, Maintaining Vicos OC 101 operations control system. • Installation and Maintenance of Time Distribution System (TDS) & Radio. • Supports the Installation team during T&C phase of Switch machine. • T&C and maintaining Position and detection system (TPDS). • Maintaining on TLC (Traffic light Control) system for people mover system. • Supports site testing during the integration and commissioning period. • Supports System T&C team on shore during test execution of System Integration Test, System Operation Demonstration Test, Trial Run and Revenue Operation support. • Ensures all site installation drawings, documents and SW releases are kept current to relevant revisions. • Responsible for the modification in the system like hardware and update the system software as per the given procedure. • Support training of customer testing, operation and maintenance staff with respect to the related control system. • Safety Critical competencies (where applicable).
4 yrs 11 mos
Full-time
Jul 2013 - Jun 2018
• ATC (Automatic Train Control) Central, On-Boarding, Data Communication and Wayside Station Equipment for Dubai Metro maintaining with Global Safety Standards & Safety Critical Communication during various work site activity. • Sound Knowledge thorough understandings of railway signaling principles, track circuit, moving and fixed block, CBTC, axle counter etc. • Worked for ATC Management, Activation & Operational level for maintain ATS, ATO & ATP. • Works as per Schedule of Preventive Maintenance of equipment as per priority perform Corrective Maintenance of central, on-boarding, data communication and wayside equipment. • Worked on various equipment like SGVCC (Vehicle Control Central),VOBC On-Board Control, Data Communication FID & Inductive Loop, Wayside station controller STC-PDIU & Switch Machine etc. • Responsible for all Indoor & Outdoor Signaling and Communication work. • Maintaining Signaling & communication Equipment’s like VOBC, VCC, FID Inductive Loop, PDCU (Platform Door Communication Unit), Switch Machine, BBR (Broad Band Radio), etc. • Worked as per cable core, cable route, CTF and Data CTF Plans. • Testing & flashing Relays on Relay Doctor, flasher as per requirments. • Work for WODS (Way-site obstacle detection system), monitored alarm and take action as per needful. • Worked on SMC (System management center), CCOT (Central control operator terminal),FODR, FODF, data Interface, ESB,FEP ,Snooper, Backup servers etc. • Also PM & CM Of communication equipment like Broad Band Radio (BBR). • Ensure the team refer to necessary technical drawings, signalling, schematics, operations and maintenance manuals, procedure and work instruction when performing, repair and maintenance work. • Responsible for the modification in the system like hardware and update the system software as per the given procedure.
7 mos
Full-time
Dec 2012 - Jul 2013
• Remarkable time management and teamwork skills. • To study and analysing in house as well as customers & ensure quality in production. • To maintain the hourly monitoring without failure. • Responsible for new product developments making sample data sheet and layout inspection report. • Regular time study for increased the production. • Understanding of Production Planning, Scheduling, Man Power allocation and Costing, adept at reducing downtime. • Worked on KOKUYO PROJECT and responsible for sample product, quality, manpower. • To maintain monthly production data as per customer plan. • Managing raw material and product inventory. • Managing manpower • Developed and implemented strategies for various manufacturing process and ensured delivery of quality product. • Training the new hires.
2 yrs 5 mos
Full-time
Jul 2010 - Dec 2012
• To implement the logo Safety First but Work Must in the Productions shop. • To check the Welding Strength & Welding penetration. • Setting up machines and plant. • Managing raw material and product inventory. • Assisted the development of new welding procedures and techniques for fabricating metals. • Resolve welding issues in mechanical equipment. • Calculate high-peak production activities and analysis on reducing downtime and outages. • Knowledge of all kind of welding like Mig,Tig,Spot & Robotic welding etc. • Collaborate with the maintenance staff and troubleshoot, repair and maintain equipment. • Managing raw material and product inventory. • Provide support to design of new product for customers and assisted customers in requirement.
5 mos
Full-time
Feb 2010 - Jul 2010
• Producing the production with right quality & quantity. • Responsible for man, material availability and allocation – Resource Management. • Daily work management. • Preparation & updating and changing Sop’s for various stages. • Development Multi skilling. • Accountability for Waste management & rework. • Responsible for productivity & process improvement. • Responsible for continuous improvement through KAIZEN & POKA-YOKE. • Responsible for Workmen Trainings-SOP, Kaizen, Poka yoke, House Keeping (5’S). • Follow up problems by doing CAPA (Corrective Action, Preventive Action). • Basic knowledge of material handling equipment and related safety norms.
2 yrs 11 mos
Patents or Awards not yet added
Skills not yet added
Languages not yet added
No Feeds posted yet
No products to show here
No jobs to show here
No Feeds posted yet
Recent Articles
9 months ago
11 months ago
12 months ago
one year ago
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)