Leading a group of local engineers and technicians in DHAKA to achieve the commissioning phase of
the CBTC revamping project for Dhaka Metro Line 6 and responsible of the commissioning.
- Design and testing of the interfaces Communication system related interfaces with third parties viz.
Civil contractors (viaduct, stations, depot and OCC), PSD, Fire Alarm system, Rolling Stock, Power
SCADA, and Uninterrupted Power Supply system.
- Management of operational team
- Prepare and conduct the tests SYS/ATS (Automatic Train Supervision)
- Follow-up of validation for T&C part
- Performance reporting / Analyzing results
- Interface between customer and offshore team
- Training CBTC to the maintenance team
Use of the (Factory Integration & Validation Platform)
- Ensure the effective functioning of the Interlocking and CBTC (updates, troubleshooting)
- Creation of test scenarios
- Closure of non-conformities with the customer
5 yrs
Full-time
Nov 2019 - Present
Leading a group of local engineers and technicians in DHAKA to achieve the commissioning phase of the CBTC revamping project for Dhaka Metro Line 6 and responsible of the commissioning of the test track : - Design and testing of the interfaces Communication system related interfaces with third parties viz. Civil contractors (viaduct, stations, depot and OCC), PSD, Fire Alarm system, Rolling Stock, Power SCADA, and Uninterrupted Power Supply system.
1 yr 7 mos
Full-time
Mar 2018 - Oct 2019
Working as A Technical Team Lead (Testing and Commissioning) I am responsible for:- • System Integration of THALES seltrac MS(CBTC) for DOHA Metro project. • Testing and commissioning of internal subsystem (Zone controller, ATS and DCS) • Testing and commissioning of Field signaling gears (Post installation check out & Power up tests) • Detailed analysis of Onboard controller Dynamic tests.
2 yrs 4 mos
Full-time
Oct 2015 - Feb 2018
I am responsible for Installation testing and commissioning of CBTC equipment's Way Side (WRS), Indoor (SPARCS) and on-boards (VRS) System. Customer focus, Planning, Action oriented, Process Management, Priority setting and Delivery. -Team Player, Leader ship, Interpersonal skills, Contract (Response, Negotiation and Compliance) -Review of Scheme plan, power distribution, System architecture Cable core plans, Control Table etc., -Exposure in Railway si
4 yrs
Full-time
Aug 2011 - Aug 2015
Working as a Assistant Manager (Project Operation) I am responsible for :- ● Responsible for end to end project management of all the above projects starting from award to completion of work. ● Contract management, Rate analysis, Negotiation with client and Sub contractors. ● Awarding work contracts to suitable sub contractor after proper rate analysis. ● Responsible for tracking and maintaining profitability of all the projects. ● Preparing regularly project status report for review by top Mana
6 yrs
Full-time
Jul 2005 - Jul 2011
Started my career as a site supervisor responsible for planning and execution of signaling equipment installation. Later on, involved in the project engineering activities dealing with the entire construction and commissioning life cycle evolving with the development of safe and efficient railway signaling system.
3 yrs
16 January, 2022
Patents or Awards not yet added
Skills not yet added
Languages not yet added
No Feeds posted yet
No products to show here
No jobs to show here
No Feeds posted yet
Recent Articles
9 months ago
11 months ago
12 months ago
one year ago
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)