Senior Section Engineer at
Konkan Railway Corporation Limited
Interlocking
Kalyan, India
Summary not yet added
5 yrs 3 mos
Full-time
Aug 2019 - Present
As Senior Section Engineer for Signalling and Telecommunication department of USBRL Project responsible for Installations and maintenance of all the Signalling and telecommunication gears for Salal and Dugga stations and related block sections. Planning, preparation, designing and verification of Design and Drawings, along with Execution accordingly. Provision and maintenance of ILL connectivity and networking between remote sites with the Central head office.
Planning and preparation of technical drawings and designs based on surveys such as Station Floor Plan, Cable Arrangement Plan, Cable Distribution Plan, Cable Corage Plan, Location wiring; Interface Circuit; Application Logic; VDU design; Earthing Plan; MSDAC Cable Plan; IPS schematic etc.
As Senior Section Engineer leading team of 12 engineers for planning, timely execution and supervision of indoor and outdoor works at multiple tunnels, bridges and other topographical locations simultaneously.
Assisted and facilitated high profile visits such as Minister of Railways, Railway Board, GM, CAO, CMD, and other such higher officials at multiple events and inspections.
Visit at Factory sites at Gurgaon, Gaziabad, Kolkata, etc for Quality Assurance and deliverance of finished railway products of highest grade of quality and finishing.
Successfully performed Factory Acceptance Testing of Advance Electronic Interlocking for Salal A and Dugga Stations at Hitachi HQ at Noida.
Provisioning and maintenance of Telecommunications facilities such as Internet Lease lines and Cellular Connectivity to remote locations for ensuring uninterrupted connectivity with Central head offices
Planning and maintaining PCDO, MCDO and various data in MS Excel and MS PowerPoint and Presentation of Work progress to Higher Authority on weekly basis;
Execution of Training of newly recruited JTAs and upskilling and cross skilling of existing staff
3 yrs 3 mos
Full-time
Jul 2016 - Oct 2019
Analyzed Business Requirements documents to get better understanding of the system both on technical and business perspectives. Performed functional testing, UI, UAT, System & Regression testing, and end-to-end testing during different stages of the application development. Worked in the agile environment with frequently changing requirements and features set. Prepared Test Plans, Test Scripts and Test Cases based on functional specs and user requirements. Automated complete Test cases on HP UFT
4 yrs 7 mos
Patents or Awards not yet added
Skills not yet added
Full Professional
Professional Working
No Feeds posted yet
No products to show here
No jobs to show here
No Feeds posted yet
Recent Articles
9 months ago
11 months ago
12 months ago
one year ago
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
Upload
Attachment
(This field entry appear not only on your profile but also on generated CV)
(This field entry appear not only on your profile but also on generated CV)