By Joanie Zhao
Posted 12 months ago

Which problem do you meet when using rail drilling machines? How should it be solved?

Rail Infrastructure

Share
banner image

As the production automation continues to improve, the application of Rail drilling machines is rapidly expanding, the variety and specifications of products continue to increase, performance and quality are constantly improving, and the market sales output value is also growing steadily.

So which problem do you meet when using rail drilling machines? How should it be solved?

1.Breakage of the tap of the drilling machine: Solution: When the tap of the drilling machine breaks, the diameter of the threaded bottom hole must be correctly selected; the inclination of the sharpening edge or the selected spiral groove tap should be used, and the depth of the drilled bottom hole must meet the specified standards; Appropriately reduce the cutting speed and select according to the standard; correct the tap and the bottom hole when tapping to ensure that their coaxiality meets the requirements, and select a floating tapping chuck; increase the tap rake angle and shorten the cutting cone length; ensure that the workpiece hardness meets the requirements , choose a safety chuck; if the tap is worn, it should be replaced in time.

2. Tap chipping; solution: tap chipping reduces the rake angle of the tap appropriately; increases the length of the cutting cone appropriately; reduces the hardness and replace the tap in time. If the tap wears too fast, reduce the cutting speed appropriately; reduce the tap rake angle and lengthen the length of the cutting cone; choose a cutting fluid with good lubricity; perform appropriate heat treatment on the workpiece; and sharpen the tap correctly.

3. The pitch diameter of the thread is too large; Solution: The pitch diameter of the thread is too large. Choose a tap pitch diameter with a reasonable accuracy level; select the appropriate cutting fluid and appropriately reduce the cutting speed; correct the coaxiality of the tap and the thread bottom hole when tapping. Use a floating chuck; appropriately reduce the rake angle and cutting cone relief angle; remove the burrs produced by sharpening taps, and appropriately increase the cutting cone length.

4. The thread pitch diameter is too small; Solution: If the thread pitch diameter is too small, choose a tap pitch diameter suitable for the accuracy level; appropriately increase the tap rake angle and cutting taper angle; replace the tap that is too worn; the automatic tapping machine should be lubricated Good cutting fluid.

5. The thread surface roughness value is too large; solution: the thread surface roughness value is too large, appropriately increase the tap rake angle and reduce the cutting taper angle; perform heat treatment, appropriately increase the hardness of the workpiece, and ensure that the tap rake surface has a lower surface Choose a cutting fluid with good lubrication for the roughness value; reduce the cutting speed appropriately; replace worn taps for the automatic tapping machine.

#Rail #drilling #machine #equipment #problem #solve

To continue reading Register Now or Login

Suggested Articles for you

Export - Posted one year ago

Railway track maintenance equipment!

Railway track maintenance equipment! Track maintenance refers to the activities carried out to ensure that rail tracks are in good condition and safe for train operations. It involves the inspection, cleaning, repair, and upgrading of track components such as rails, sleepers, ballast, ties, switches, and crossings. Proper track maintenance is essential for ensuring safe and reliable train operations, reducing the risk of derailments, improving ride quality, enhancing train speeds and reducing operating costs. There are several small machines used for track maintenance. Some of them are: Rail Drill: Used to drill out existing holes in rails and install bolts for rail joints. Rail Grinder: Used to grind the surface of rail tracks to the correct profile to reduce noise and improve ride quality. Rail Saw: Used to cut rails to length and to make specialized cuts for rail joints or curves. Spike Pullers: Used to remove spikes from ties during rail replacement. Tie Tamper: Used to pack ballast under the ties and level the track to ensure stability. Ballast Regulator: Used to distribute ballast evenly along the track to ensure proper drainage and stability. Rail Lifter: Used to lift rails off of the ties during rail replacement or track maintenance. These machines can be used by maintenance crews to perform maintenance activities and repair on the tracks more efficiently and safely. Jodie Yuan Export@linkagetrack.com #trackmaintenance   #trackconstruction   #railcutter   #railgrinding   #railtamping   #raildrilling   #railwrench

Read Full Article

Joanie Zhao - Posted one year ago

Why you need a railway concrete sleeper bolt drilling machine?

The Railway Concrete Sleeper Bolt Drilling Machine plays a crucial role in railway maintenance work, offering several important benefits. Here are some key points highlighting its significance: Precision and accuracy: Railway tracks require secure fastening to ensure stability and safety. The bolt drilling machine provides exceptional precision and accuracy when drilling bolt holes in concrete sleepers. This ensures that the bolts fit perfectly, preventing any potential issues or hazards caused by loose or misaligned tracks. Time and labor savings: Manual drilling of bolt holes in concrete sleepers is a labor-intensive and time-consuming process. The bolt drilling machine significantly reduces the time and effort required for this task. It automates the drilling process, enabling faster completion of railway maintenance projects and reducing labor costs. Consistency and quality: Maintaining consistent quality across all bolt holes is essential for the overall integrity of the railway tracks. The machine ensures uniform drilling depth and diameter, eliminating variations that can compromise the structural stability of the tracks. This consistent and high-quality fastening enhances the overall reliability and longevity of the railway system. Increased productivity: The efficiency of the bolt drilling machine allows railway maintenance crews to accomplish more work in less time. With its high drilling speed and capacity, the machine can handle a large volume of drilling tasks, contributing to increased productivity and project throughput. Versatility and adaptability: Railway networks often have different sleeper sizes and designs. The bolt drilling machine is designed to be versatile and adaptable, capable of accommodating various sleeper specifications. This flexibility makes it suitable for a wide range of railway maintenance projects, regardless of the specific track configuration. Enhanced safety: Railway maintenance work involves potential hazards, and the bolt drilling machine incorporates safety features to protect operators. These may include safety guards, emergency stop buttons, and ergonomic designs to minimize operator fatigue and reduce the risk of accidents during operation. Longevity and durability: Railway infrastructure requires long-lasting solutions. The bolt drilling machine is constructed with robust materials and engineered to withstand the demanding conditions of railway maintenance work. Its durability ensures reliable performance over an extended period, reducing maintenance and replacement costs.

Read Full Article

Joanie Zhao - Posted one year ago

Why do regular ballast bed tamping work insist on small tamping machine?

Regular ballast bed tamping work often involves manual labor for several reasons: Flexibility and Adaptability: Manual work allows the tamping crew to assess the condition of the ballast bed and make real-time adjustments based on their expertise. They can identify specific areas that require additional or less compaction and adjust the intensity and direction of the tamper accordingly. Manual work enables the crew to adapt to varying conditions, such as changes in the ballast quality or track geometry. Precision and Control: Manual tamping provides a higher level of precision and control compared to automated or mechanical methods. Experienced workers can apply the right amount of force and distribute it evenly, ensuring proper compaction of the ballast bed. They can also detect any irregularities, such as soft spots or voids, and address them promptly. Safety Considerations: Manual tamping allows workers to visually inspect the ballast bed and identify any potential safety hazards, such as loose fastenings, damaged sleepers, or track misalignments. These issues can be addressed immediately, reducing the risk of accidents or derailments. Manual work also enables workers to maintain a safe distance from moving trains and machinery, ensuring their safety during the tamping process. Cost Considerations: Manual tamping is often more cost-effective, especially for smaller maintenance projects or locations with limited access for machinery. Automated or mechanical methods may require significant investment in specialized equipment, which may not be economically feasible for every project. Manual tamping can be performed with basic hand tools and a smaller crew, reducing equipment costs and operational expenses. While manual tamping work has its advantages, it is worth noting that the railway industry is constantly evolving, and there are automated and semi-automated solutions available for ballast tamping. These technologies aim to enhance efficiency, accuracy, and productivity while reducing physical labor. However, the decision to adopt such methods depends on various factors, including the project scale, budget, and specific requirements of the railway network.   More Rail tamping solutions please contact 008615015909102  email: inquiry@linkagetrack.com

Read Full Article